Restaurant opening and closing checklist
9 opening items and 8 closing items, each with a tick box and columns for initials and time, plus a notes area.
Pair it with the restaurant manager log book.
Free printable opening and closing checklists for restaurants and bars. One sheet per day: the opening list at the top, the closing list below, a tick box, initials and time for every item, and room to note anything that was skipped. The same lists come built into ShiftLogKit, where you can run them on a phone instead.
Single-page PDFs. Print at actual size (100%) and clip a day's sheet to the office door or the back bar.
9 opening items and 8 closing items, each with a tick box and columns for initials and time, plus a notes area.
Pair it with the restaurant manager log book.
7 opening items and 8 closing items, each with a tick box and columns for initials and time, plus a notes area.
Pair it with the bar manager shift log.
The previews below match the PDFs. Printing from this page prints only the checklists, one per page.
For the neatest result on any printer, use the PDF downloads above.
Restaurant opening and closing checklist
One sheet per day
Date
Location
Opening manager
Closing manager
| Done | Task | Initials | Time |
|---|---|---|---|
| Alarm off, doors unlocked, lights on | |||
| Walk-in and reach-in temperatures checked (record them in your food-safety log) | |||
| Hood fans, ovens, fryers and dish machine on | |||
| Opening cash drawers counted | |||
| Yesterday's log and open follow-ups read | |||
| 86 list checked with the kitchen | |||
| Restrooms clean and stocked | |||
| Dining room set, floors and entrance clear | |||
| Pre-shift huddle: specials, 86s, reservations, large parties |
| Done | Task | Initials | Time |
|---|---|---|---|
| All guests out, front door locked | |||
| Ovens, fryers, grill and hood fans off | |||
| Food labeled, dated and stored; walk-in door closed | |||
| Dish machine drained and cleaned | |||
| Cash counted and dropped in the safe | |||
| Trash and recycling out, back door locked | |||
| Log written and follow-ups assigned | |||
| Alarm set |
Bar opening and closing checklist
One sheet per day
Date
Location
Opening manager
Closing manager
| Done | Task | Initials | Time |
|---|---|---|---|
| Ice bins filled, ice scoops in their holders | |||
| Garnishes prepped and dated | |||
| Tills counted, POS and card readers on | |||
| Beer coolers and keg room at temperature | |||
| Speed rails stocked, back-ups in place | |||
| Restrooms clean and stocked | |||
| ID check guide and incident log at the bar |
| Done | Task | Initials | Time |
|---|---|---|---|
| Last call done, all guests out | |||
| Tills counted, drop made, safe locked | |||
| Glass washer drained and cleaned | |||
| Pour spouts covered, garnishes stored or discarded | |||
| Coolers closed, keg room locked | |||
| Floors swept and mats up | |||
| Log written and follow-ups assigned | |||
| Alarm set, doors locked |
The hotel template in the app includes a "Shift start" list for every shift and an "Overnight round" for the night team. See the hotel shift log page for the full lists, or print thehotel front desk log sheet.
In ShiftLogKit these lists are checked off on a phone for each shift, with who ticked each item and when. Lists can repeat daily, on weekdays or weekly, and anything still unchecked when the shift ends is flagged in the daily digest, so the owner sees it without reading every sheet.